2 Layer Model

   05 Miedema & Ramsdell (2014) Normal Stress Approach with the Miedema & Matousek (2014) Bed Shear Stress Approach

The Miedema (2014) model based on a normal stress distribution, with the Miedema & Matousek (2014) bed shear stress approach. 

The graphs support the following papers:

  1. Miedema, S.A., “An Analysis of Slurry Transport at Low Line Speeds”. ASME-OMAE 2014, San Francisco, USA, June 2014.
  2. Miedema, S.A., Ramsdell, R.C., “An Analysis of the Hydrostatic Approach of Wilson for the Friction of a Sliding Bed”. WEDA 34/TAMU 45, Toronto, Canada, June 2014.
  3. Miedema, S.A. & Matousek V., “An explicit formulation for the Darcy-Weisbach friction factor of sheet flow”. 15th International Freight Pipeline Society Symposium 2014. 24-26 June 2014, Prague, Czech Republic.

Material from this website is free to use, but if you use it in a publication or report please add the following reference:
Miedema, S.A., "The Delft Head Loss & Limit Deposit Velocity Model". www.dredgingengineering.com. Delft, The Netherlands, 2012-now.

The hydraulic gradient versus the line speed.

The normalised hydraulic gradient versus the relative line speed.
The hydraulic gradient is normalised by dividing by the hydraulic plug gradient.
The line speed is relative by dividing by the maximum limit deposit velocity.

 

The relative excess hydraulic gradient versus the relative line speed.
The line speed is relative by dividing by the maximum limit deposit velocity.

 

The relative volumetric transport concentration versus the relative line speed.
The volumetric transport concentration is relative by dividing by the volumetric bed concentration.
The line speed is relative by dividing by the maximum limit deposit velocity.

 

The relative slip velocity versus the relative line speed.
The slip velocity is relative by dividing by the line speed.
The line speed is relative by dividing by the maximum limit deposit velocity.

 

The relative bed velocity versus the relative line speed.
The bed velocity is relative by dividing by the line speed.
The line speed is relative by dividing by the maximum limit deposit velocity.

 

The hydraulic gradient versus the line speed.

 

The normalised hydraulic gradient versus the relative line speed.
The hydraulic gradient is normalised by dividing by the hydraulic plug gradient.
The line speed is relative by dividing by the maximum limit deposit velocity.

 

The relative excess hydraulic gradient versus the relative line speed.
The line speed is relative by dividing by the maximum limit deposit velocity.

 

The normalised excess hydraulic gradient versus the relative line speed.
The excess hydraulic gradient is normalised by dividing by the hydraulic plug gradient.
The line speed is relative by dividing by the maximum limit deposit velocity.

 




 Login | Home | Resources | Site map | Traffic | 91 active visitors 

Fullxml powered website © fullxml.org
Last updated
Copyright 2001- © Dr.ir. S.A. Miedema - all rights reserved



Copyright © Dr.ir. S.A. Miedema

Send email to WebMaster with questions or comments about this website.